垃圾填埋排水系统设置方式探讨
简介: 垃圾的卫生填埋设计和运行管理的难点是渗沥液的处理。垃圾渗沥液成份复杂,且水质水量变化范围大,这些特点给渗沥液处理厂的设计及运行管理带来极大的困难。采用修筑环场截洪沟、分区设置清污分流排水系统、截洪与分区分流系统并用等措施,取得了良好效果。 A Study on the Setting of Drainage System for Garbage Backfilling Abstract:Disposal of percolate is a difficulty in the designing and operational management of garbage sanitary backfilling.The composition of garbage percolate is complicated and the quality and quantity of the percolate vary greatly.These features bring about huge difficulties to the designing and operational management of percolate disposal facilities.Good results were obtained by building a floodwater catching channel around a garbage dumping ground setting a zoned separate sewage system and by the combined use of the floodwater catching system and the separate sewage system. 概述 垃圾的卫生填埋是目前我国城市垃圾集中处置的主要方式,垃圾填埋场的设计和运行管理中最令人头痛的问题是垃圾渗沥液的处理。由于垃圾渗沥液水质成份极复杂,且水质水量受填埋场使用年限以及垃圾成份的变化、气候等多种难以人为控制的因素影响而在很大的幅度范围内变化,这给渗沥液处理的工艺选择、设计参数的确定及运行管理带来极大的困难。渗沥液水质水量变化的另一特点是,当填埋场流出的渗沥液量大时,其水中所含污染物浓度也随之增加,往往使处理厂承受的负荷几十倍地增加。因此,如何尽量减少填埋场排出的渗沥液量是一个值得探讨的问题。 1 环场截洪沟系统 排水系统一般是根据地形环绕填埋场修筑一条或不同高程的数条截洪沟,分别拦截各截洪沟外围汇水区域内的降雨。当填埋区扩展到某高程截洪沟时,就将该截洪沟排放场外的通道截断,而将其与场内为导出渗沥液而设置的导渗沟连通,变该条截洪沟为导渗沟。其中沟顶面高程等于最终覆盖面的那部分截洪沟可改为最终覆盖面表面排水沟加以利用。当填埋场是利用较大的山谷或废弃的山塘水库,且其填埋区以外汇水面积较大时,如图1,可采用环场截洪沟系统,以尽量减少进入填埋场的降雨量,达到减小渗沥液量的目的。这种系统的优点是运转可靠,管理简单,但在地形较为复杂,山脊山谷较多的地形条件下,截洪沟的长度较长,建筑费也会较高。值得提出的是,截洪沟的修筑不适宜采用机械开挖施工,而应采用人工开挖,以尽量减少对原自然植被的破坏,否则有可能造成以后水土大量流失,给管理带来极大麻烦,甚至危及截洪沟和填埋场其它设施的安全。广州市李坑填埋场就有过类似的教训。
1.1 地形平坦的填埋场 1.2 植被丰富的填埋场 2 分区分流排水系统 当填埋场区面积较大或场区所在地植被丰富、覆盖率较高的情况下,特别是当填埋区面积较大时,可考虑设置分区清污分流排水系统。此类型的排水系统也应根据填埋场区内的地形地貌情况,采用不同的分区方式。 3 综合排水系统 在地形较为复杂的地方,有时需根据实际情况在不同区域分别采用上述几种排水措施,才能有效地减少进入填埋垃圾区的水量,这时就要求设计人员要深入实地仔细详尽地观察地形地貌条件,调查自然汇水的走向,以及进行必要的水文地质勘测。 4 结束语 渗沥液的处理是垃圾最终完成无害化处理的关键;设计填埋场的排洪导渗系统时,应因地制宜地选择排水系统,才能收到事半功倍的效果。
作者简介:
更多网友评论 » |
会员评论